Potholes تم حفظه في الأرشيف

3299 Lake Boone Trail Raleigh, NC 27607, USA عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

ID قضية:

708697

Submitted To:

Raleigh City Hall

فئة:

Potholes

شاهدوا:

1067 مرات

حي:

Glenwood

ذكرت:

في

الوصف

It has been over a month since Ridge Road began a resurfacing program and approx 3 weeks since a contractor has done any work on this section. Today is the day the signs say the work will be complete and the entire length of road is still in the patching phase with no sign of a roadway crew and finish product. Can this get fixed? Soon? I would guess that this is one of the most used cycling routes in the city and it is unbearable and unsafe to ride on. It is also a much louder surface for the residence when cars drive by.


8 تعليقs

  • Bill (مستخدم مسجل)

  • تم إقراره City of Raleigh 3 (تم التحقق رسميا)

  • مغلق City of Raleigh 3 (تم التحقق رسميا)

  • فتح An anonymous SeeClickFix user (مستخدم مسجل)

  • Andy (ضيف)

  • VEC (مستخدم مسجل)

  • VEC (مستخدم مسجل)

  • مغلق SeeClickFix Moderators (مستخدم مسجل)

التعليقات مغلقة لقضايا المؤرشفة.