الوصف
Since May every time it rains heavily, the rain slowly comes in through the stove vent. There have been multiple attempts to fix the problem. It was fine for about 2 months, however, it could be the lack of heavy rain and wind combination. There is a growing water mark on the kitchen ceiling near the vent. This issue leaves the stove unusable.
There has also been an on going leak in another apartment in the building. (#4) including a massive flood in July. The leak in that apartment has also been on going.
It is my hope that a city inspector is able to come and inspect the status of the roof. This issue has not been resolved and fixed since they began in apartment #2 in May and apartment #4 in June. I have on going documentation of the complaints entered to the building owner.
4 تعليقs
City of Albany IT (مستخدم مسجل)
تم إقراره BRC - Carlo F (مستخدم مسجل)
BRC - Carlo F (مستخدم مسجل)
مغلق Bryant, Buildings and Reg.Compliance (مستخدم مسجل)