Descrição
The manager at Reverie is taking away the orange cones which block the "bus lane" where pedestrians are walking so people can park in front of his business. The Parking meter was covered and the entire Lane was coned off so the plethora of pedestrians could walk. This is dangerous hat he is moving these cones so people ca. Still park where people should be able to safely walk while building construction is happening.
10 Comentários
Clean and Safe Hillsborough Street (Utilizador Registado)
Golden Boy (Utilizador Registado)
Encerradas NICK (Oficial Verificado)
Reaberta Proxy (Visitante)
Encerradas Sgt. Steve (Utilizador Registado)
Reaberta CaptainConservative (Utilizador Registado)
CaptainConservative (Utilizador Registado)
Clean and Safe Hillsborough Street (Utilizador Registado)
Kitty (Utilizador Registado)
The container tunnel has been blocked off many times with a side walk closed barricade.
Encerradas cawalker (Utilizador Registado)
I have been told that:
(1) The closed off parking area (meter station covered in plastic, parking lines painted black) is to be used as needed by the company doing the construction.
(2) That company is paying the city for the use of that parking area.
To verify that, I suppose one would have to contact the part of city government that manages street parking in the area.
It could also be determined whether the closed off parking area is also a temporary bus lane when not being used by the construction company.
Some appropriate signage in the area could help reduce confusion.