说明
The construction site at 222 First Street, between Grove and Erie, already blocks half of the sidewalk with a chain link fence.
Now they've left the other half a slushy mess, which will only get more treacherous as temperatures drop.
The construction site at 222 First Street, between Grove and Erie, already blocks half of the sidewalk with a chain link fence.
Now they've left the other half a slushy mess, which will only get more treacherous as temperatures drop.
2 评论s
Jessica (注册用户)
关闭 9InchNail (注册用户)