Opis
The far right entire lane for many dozen feet approaching the ramp and once on the right I-64 West entry ramp while traveling on Northampton Blvd but not yet on I-64 is in serious need of repair. Several old pothole patches have worked their way loose or disintegrated leaving uneven and bumpy and pothole filled sections of the lane leading to the I-64 W on-ramp for the interstate off Northampton Blvd clustered more on the right side of the far right lane hitting the center and passenger side of the vehicle.
This is still ON Northampton Blvd but is approaching the interstate on ramp for I-64 West. This lane is in serious need of repair and smoothing. Too many uneven patches in one spot for several dozen feet make for rough driving when approaching the exit at any time of day and at any speed.
This issue continues onto the ramp also.
11 Skomentujs
Alison M (Zarejestrowany użytkownik)
Alison M (Zarejestrowany użytkownik)
Alison M (Zarejestrowany użytkownik)
Halima M Arias (Guest)
Good Morning Alison,
Thank you for reporting this issue. We will route this concern over to the Department of Public Works Operations Division for action and investigation. All potholes are inspected to within one to two days and the estimated timeline for completion is 7 days.
The best way to contact the city for any issue or inquiry you may have is through the Norfolk Cares IMPACT Call Center by any of the below listed contact methods:
Phone: 757-664-6510
E-Mail: healthyneighborhoods@norfolk.gov
Web: norfolk.gov
Alison M (Zarejestrowany użytkownik)
Alison M (Zarejestrowany użytkownik)
Zamknięte Halima M Arias (Zarejestrowany użytkownik)
Good Morning,
Thank you for submitting your concerns. Your request was completed by the Streets and Bridges Division on 02/04/2015. Should you have any future concerns regarding the City of Norfolk, please contact our IMPACT Call Center at (757) 664-6510.
Respectfully,
Halima M Arias
Ponownie otwarte Alison M (Zarejestrowany użytkownik)
Halima M Arias (Zarejestrowany użytkownik)
Good Morning,
Thank you for submitting your concerns. I have re-opened your request and it has been routed to the Streets and Bridges Division for investigation and action. The estimated timeline for initial response is 24 hours, and the request should be completed within 7 days dependent on the severity.
Your Request ID# is: 2015-2239518. Please report all future concerns regarding the City of Norfolk to the IMPACT Call Center at (757) 664-6510, healthyneighborhoods@norfolk.gov, norfolk.gov or the Citizen Request Tracker app for the iPhone.
Respectfully,
Halima M. Arias
Customer Service Manager
Halima M Arias (Zarejestrowany użytkownik)
Good Afternoon
The Streets and Bridges Division is planning on milling and re-surfacing the right turn lane from Northampton to the interstate 64 on-ramp in front of the Lake Wright hotel and a number of the lanes on Northampton Blvd under the I-64 overpass in both directions once the weather breaks…hopefully in March.
Zamknięte Alison M (Zarejestrowany użytkownik)