Mô tả
Graffiti on retaining wall below sidewalk at Lake Merritt Blvd, by connector path that leads towards lake from northwest end of vehicular bridge. This one was reported earlier and closed last month by the City, but same graffiti is still there. Photo attached.
4 Bình luậns
Được thừa nhận City of Oakland (Chính thức đã xác nhận)
Đã đóng City of Oakland (Chính thức đã xác nhận)
Mimi (Người dùng đã đăng ký)
Erica C. (Người dùng đã đăng ký)