Mr. Murphy,
Attached is a picture of the pothole in question. If the pothole you said was filled on 3/18/15 is was definitely not this one and if it was filled, your guys did a poor job. Now that we're getting a break in weather and the ground is thawing out, can you see to it that this gets addressed in a proper fashion?
I know your Dept. is busy this season but our side streets can not be ignored. The pot hole is between 48 and 50 Ivy st.
Thank you.
You are correct, my alologies this block was missed. A crew was there this morning, all potholes were filled. Sorry gfor the mixup, and thank you for bringing this to our attention.
9 评论s
Jeffb (注册用户)
已确认 Assistant Superintendent of Public Works (官方验证)
Michael J Martello (注册用户)
Kevin Murphy, DPW Assistant Supt. (注册用户)
r.dejesus17 (注册用户)
Attached is a picture of the pothole in question. If the pothole you said was filled on 3/18/15 is was definitely not this one and if it was filled, your guys did a poor job. Now that we're getting a break in weather and the ground is thawing out, can you see to it that this gets addressed in a proper fashion?
I know your Dept. is busy this season but our side streets can not be ignored. The pot hole is between 48 and 50 Ivy st.
Thank you.
Kevin Murphy, DPW Assistant Supt. (注册用户)
Kevin Murphy, DPW Assistant Supt. (注册用户)
r.dejesus17 (注册用户)
关闭 Assistant Superintendent of Public Works (官方验证)