Curb and Gutter Repair Inilagay sa Artsibo

1200-1216 Rhode Island Avenue Northwest Washington, DC 20005, USA Ipakita sa Mapa Itago ang Mapa
Move the marker to represent your issue's location. The address will not change.

Taong nagreport

ID ng Isyu:

847884

Submitted To:

DC 311

Kategorya:

Curb and Gutter Repair

Tiningnan:

706 beses

Lugar:

Logan Circle

Inireport sa pamamagitan ng:

mobile application

Inireport:

noong

ID ng Hiling ng Serbisyo:

13-00286700

Deskripsyon

Recently the curb cuts around the Logan Circle traffic circle have been replaced with new brick and concrete by city contractors. In some cases the work is so poor that the sidewalk and the curb cuts are no longer level. In this photo you can see that the sidewalk is about six inches higher than the curb cut, which creates a dangerous hazard. There is a sharp drop in the sidewalk. Pedestrians now trip on this sidewalk. Additionally, the purpose of curb cuts is to create smooth transitions from the sidewalk to crosswalks particularly for the disabled. This project missed the point. It was completed poorly and wasted the District's taxpayer dollars. Can the contractor re-do the areas in the neighborhood where they created uneven sidewalks and hazards for pedestrians?


2 Komentos

  • Kinilala DC 311 (Rehistradong User)

  • Isinara DC 311 (Rehistradong User)

Sarado ang komento para sa mga isyu na nasa artsibo.