Thank you for reporting this issue! Public Works Engineering is aware of the problems on Tennessee Street. A portion of Tennessee Street is currently in design to have the street repaved. The design is currently in the early stages and the area of work has not been finalized. The City of Vallejo will take the striping needs in consideration when deciding the limits of work but we are limited by funding. Design is expected to be completed by end of 2020.
I have forwarded your comment to our traffic engineer stating there is a hazard in front of the school. The traffic engineer will perform a site visit. I will update this forum once I find out more information. Thank You.
11 评论s
Coco (注册用户)
一位匿名的 SeeClickFix 用户 (注册用户)
已确认 Mey, Public Works (官方验证)
Mey, Public Works (官方验证)
Brant, Engineering (官方验证)
一位匿名的 SeeClickFix 用户 (注册用户)
Brant, Engineering (官方验证)
Public Works Maintenance Worker I (官方验证)
Public Works Maintenance Worker I (官方验证)
Public Works Maintenance Worker I (官方验证)
Public Works Maintenance Worker I (官方验证)