说明
Almost a year since I've complained by the lack of pedestrian right of way signs, I've almost been hit by oncoming cars coming from the Holland tunnel side. I was told a year ago when using this service that signs would go up as soon as in stock. This is a danger and this whole Blvd up to Hoboken needs traffic calming measures before something serious happens.
还问了...
问 Please select the issue:
答 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
答 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
问 Additional Information
答 没有给出答案
答 没有给出答案
9 评论s
RRC <small class="fwn">(官方验证)</small>
Oliver - Resident (注册用户)
已确认 AndrewV (注册用户)
Oliver - Resident (注册用户)
Traffic – Jennifer C (官方验证)
Traffic – Jennifer C (官方验证)
Oliver - Resident (注册用户)
Oliver - Resident (注册用户)
Engineering - Althea (官方验证)