Description
The contractor was required to put in a 12" X 36" stone base which was not installed, the wall is set on top of soil. 3/4" crushed stone was to be used in between the new and existing wall with a perforated pvc pipe at the base for drainage. From what I could see the pvc was never installed and the contractor is filling the gap with a mix of block, garbage and soil. I do have additional pictures if that helps, I was only able to upload one online.
Thank you for your help!