This is an unaffiliated request

Industrial part of of lower Timber Ridge Rd. needs paving! Archivé

Move the marker to represent your issue's location. The address will not change.

Reporter

(Invité)

ID du Problème:

55651

Submitted To:

Communauté

Catégorie:

Aucun

Vues:

970 fois

Quartier:

Middletown

A signalé:

le

Description

This road has been falling a part for years now. All the small patches that the city did on this road get ripped up by the snow plows every winter and the road gets worse. Recently, with the construction of the military base, trucks have been driving up and down the road all week transporting dirt to Kenneth Dooley Drive. The constant use of this road by dump trucks with huge loads continue to make the road worse.

Tear up the road, let the trucks drive on the gravel, and when work is done on Kenneth Dooley Drive, pave the road.


Problèmes à proximité

2 Commentaires

Les commentaires sont clôturés pour les problèmes archivés.