Descrizione
Last year the sidewalk was replaced on Harrison between Hamilton and Franklin. The soil abutting the sidewalk was never replaced or seeded and is now considerably lower than the sidewalk. When will this be completed post new sidewalk?
Last year the sidewalk was replaced on Harrison between Hamilton and Franklin. The soil abutting the sidewalk was never replaced or seeded and is now considerably lower than the sidewalk. When will this be completed post new sidewalk?
3 Commentos
Access Princeton (Ufficialità verificata)
Engineering - J. Laux, Construction Engineer (Utente registrato)
Riconosciuto Engineering - D.Stockton, Municipal Engineer (Ufficialità verificata)