Description
Last year the sidewalk was replaced on Harrison between Hamilton and Franklin. The soil abutting the sidewalk was never replaced or seeded and is now considerably lower than the sidewalk. When will this be completed post new sidewalk?
Last year the sidewalk was replaced on Harrison between Hamilton and Franklin. The soil abutting the sidewalk was never replaced or seeded and is now considerably lower than the sidewalk. When will this be completed post new sidewalk?
3 Commentaires
Access Princeton (Membre officiel vérifié)
Engineering - J. Laux, Construction Engineer (Utilisateur inscrit)
Reconnu Engineering - D.Stockton, Municipal Engineer (Membre officiel vérifié)