说明
Contractor at site has blocked storm drain. During periods of heavy rain, such as this weekend (12/1/12), the water will flood downhill houses. Temporarily removing blockage to this storm drain will mitigate problem.
报告人
Contractor at site has blocked storm drain. During periods of heavy rain, such as this weekend (12/1/12), the water will flood downhill houses. Temporarily removing blockage to this storm drain will mitigate problem.
1 评论
关闭 Town of Hillsborough (注册用户)