Descripción
Contractor at site has blocked storm drain. During periods of heavy rain, such as this weekend (12/1/12), the water will flood downhill houses. Temporarily removing blockage to this storm drain will mitigate problem.
Reportero
Contractor at site has blocked storm drain. During periods of heavy rain, such as this weekend (12/1/12), the water will flood downhill houses. Temporarily removing blockage to this storm drain will mitigate problem.
1 Comentar
Cerrado Town of Hillsborough (Usuario registrado)