说明
The greenway is currently blocked in both directions east and west of the Pullen Rd/Western Blvd intersection by cathedral construction. This is a main connector between NCSU main campus and Centennial campus for walkers and cyclists.
报告人
The greenway is currently blocked in both directions east and west of the Pullen Rd/Western Blvd intersection by cathedral construction. This is a main connector between NCSU main campus and Centennial campus for walkers and cyclists.
2 评论s
City of Raleigh 6 (官方验证)
已确认 NICK (官方验证)