Description
The greenway is currently blocked in both directions east and west of the Pullen Rd/Western Blvd intersection by cathedral construction. This is a main connector between NCSU main campus and Centennial campus for walkers and cyclists.
Reporter
The greenway is currently blocked in both directions east and west of the Pullen Rd/Western Blvd intersection by cathedral construction. This is a main connector between NCSU main campus and Centennial campus for walkers and cyclists.
2 Commentaires
City of Raleigh 6 (Membre officiel vérifié)
Reconnu NICK (Membre officiel vérifié)