This is an unaffiliated request

DRIVERS SPEEDING THROUGH CONSTRUCTION ZONE La Kaydiiyey

Adirondack Northway Clifton Park, NY Ka Muuji Khariidadda Qari Khariidadda
Move the marker to represent your issue's location. The address will not change.

Wariyaha

(Martida)

Bixi Aqoonsiga:

235182

Submitted To:

Community

Category:

None

Arkay:

1844 jeer

Xaafadda:

Halfmoon, NY

La sheegay:

kusaabsan/saaran

Sharraxaadda

The construction speed limit is 45 MPH through the Construction Zone on the Twin Bridges.

However, each time I have driven along this stretch where the lanes are reduced from 6 lanes down to 2 lanes, I have seen multiple drivers SPEEDING through the work zone at approximately 70-75 MPH!

I don't think there are even any "SPEEDING FINES DOUBLED FOR SPEEDING IN WORK ZONES" signs at this construction site!

I always reduce my speed at work zones because they are so dangerous. But when I do, the drivers behind me tailgate and flash their high beams, and are just very agressive and have road rage! This is unacceptable, and these menacing drivers need to be punished!!!

I also haven't seen any POLICE VEHICLES patrolling the Construction Zone, and their absence allows angry, discourteous, impatient drivers to get away with SPEEDING and someone is going to get killed!

I think the construction zone speed limit should be reduced EVEN FURTHER, down to 35MPH in this harrowing, dangerous area, where NUMEROUS fatalities take place on a regular basis!!!


Arrimaha Dhaw

7 Faalladas

  • Anonymous (Martida)

  • nynycapdist (Martida)

  • RetLEO (Martida)

  • anonymous (Martida)

  • anonymous (Martida)

  • anonymous (Martida)

  • La xidhay cdsgus (Isticmaale Diiwaangashan)

Faallooyinku waxay u xidhan yihiin arrimaha kaydsan.