When the Town re-paves roadways two crews are involved; the first is the roadway crew where all asphalt is installed by machinery; the contractor then has a hand crew that will fill the gaps that are left at driveways and walkways. The hand crew is tentatively scheduled to start this work on Longview Road within the next 1 to 1-1/2 weeks.