Description
There are numerous utility patches that are in dire need of being re-worked to smooth the street surface. These patches have been re-worked a few times, but never where they do not end up being a roller coaster ride within weeks of being done. Please excavate these, install the proper compacted base and repave the patches to allow for a smooth road surface. This is the main thoroughfare through our neighborhood.
11 Commentaires
Reconnu RVA: Customer campaigner (Utilisateur inscrit)
taz4021@cavtel.net (Utilisateur inscrit)
B (Utilisateur inscrit)
City of Richmond (Utilisateur inscrit)
City of Richmond (Utilisateur inscrit)
taz4021@cavtel.net (Utilisateur inscrit)
Odin's Dad (Utilisateur inscrit)
City of Richmond (Utilisateur inscrit)
City of Richmond (Utilisateur inscrit)
taz4021@cavtel.net (Utilisateur inscrit)
Odin's Dad (Utilisateur inscrit)
The "No Parking" signs that were put along the 1300 block in mid-April for the dates of 04/22-25 are still here - at least the ones that have not fallen off the trees and into the street.
Please take down these old signs and re-schedule paving work that was supposed to have been done in late April.