Sidewalk needs to be raised to meet new concrete pad تم حفظه في الأرشيف

تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

(ضيف)

ID قضية:

1650342

Submitted To:

City of Albany

فئة:

Sidewalk Repair

شاهدوا:

567 مرات

حي:

Helderberg

ذكرت:

في

الوصف

Sidewalk needs to be raised to meet new concrete pad. Tree has lifted one side. Backhoe can roll bucket on open side before new concrete is poored. This would only take a few minuted. This will allow proper grade for water and ice run off.other
pads are also a tripping hazard.

سئل أيضا...
Q. Please provide the exact address of the sidewalk issue/concern.
A. Side of 241 hackett blvd
Q. Please check all boxes that apply
A. Raised Panel/Tripping Points

4 تعليقs

التعليقات مغلقة لقضايا المؤرشفة.