الوصف
Street has not been repaired after the tie in to the sewer system. A few weeks ago, not sure how long as I cannot find the report, it was advised that the street would be paved within two weeks. It has not.
Street has not been repaired after the tie in to the sewer system. A few weeks ago, not sure how long as I cannot find the report, it was advised that the street would be paved within two weeks. It has not.
5 تعليقs
Newnan, Georgia (مستخدم مسجل)
مغلق An anonymous SeeClickFix user (مستخدم مسجل)
City Engineer (مستخدم مسجل)
فتح An anonymous SeeClickFix user (مستخدم مسجل)
مغلق City Engineer (مستخدم مسجل)