City Engineer 已存档

429 West 26th Street Houston, TX 77008, USA 在地图上显示 隐藏地图
Move the marker to represent your issue's location. The address will not change.

报告人

问题 ID:

1611620

Submitted To:

City of Houston

类别:

City Engineer

已查看:

199 次数

社区:

Greater Heights

报告方式:

mobile application

已报告:

服务请求 ID:

69954

说明

West 26th street has dramatically changed from sparse residences to high density residences. Additionally it is a feeder for the wonderful bicycle path along Nicholson toward downtown. W 26th with all the new residential units is also a traffic connector for all housing west of Yale and north of 25th as it is the only through street without speed bumps between Yale and Shepard so anyone coming to 610 with the Nicholson access ramp is likely to use it. Recently a developer has modified the street in a manner that essentially eliminates roadside parking to maximize their curb yard. If cars park on the curb (as visitors will for these high density homes the developer created) the road is less than 9 feet wide. Eliminating the ability for traffic to move through. Additionally, the curb starts immediately within the current street and does not have the required 50 feet of transition when a ditch meets a curb according to the city ordinance. This same contractor did the same thing at the other side of the street and had to rip out the curb and redo it. Please correct this too! What makes this even more difficult is that they have narrowed the street the most at the only access drive for our 10 unit shared driveway. If anyone parks in the street at all - any visitors to our homes that park on our side of the street, we can't get out of our only access driveway!

还问了...
What is your concern? Select one and describe details in Additional Description:
Street cut

2 评论s

  • 已确认 City of Houston 311 (官方验证)

  • 关闭 City of Houston 311 (官方验证)

存档问题的评论被关闭。