说明
Per understanding from the City of Dunwoody Public Works Department, Perimeter Center Place was scheduled to be striped for Bike Lanes as part of the resurfacing/paving project. The road has been re-paved with the last few days. There are "temporary" / hashed lane markings that show the OLD configuration -- 2 travel lanes each direction. What has been communicated is that this segment would be changed to: a) Center Turn Lane; b) one motor vehicle travel lane in each direction; c) Bike Lanes on both sides.
5 评论s
已确认 Dunwoody Public Works (注册用户)
Dunwoody Public Works (注册用户)
Joe Seconder (注册用户)
Dunwoody Public Works Manager (官方验证)
关闭 Dunwoody Public Works Manager (官方验证)