Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
The Engineering Department re-inspected the site on 7/30/2021. We have determined that the sidewalk does need to be repaired. The site has been added to our master list for repairs.
3 Comments
Hamden, CT (Verified Official)
Acknowledged Staff Engineer (Verified Official)
Engineering Inspector (Verified Official)