الوصف
Since putting new water lines on Shore Road and King Street
the roads were improved. Winter has taken a toll on the repairs.
We were told the roads would be resurfaced in the Spring.
Any idea when this will happen?
مراسل صحفي
Since putting new water lines on Shore Road and King Street
the roads were improved. Winter has taken a toll on the repairs.
We were told the roads would be resurfaced in the Spring.
Any idea when this will happen?
8 تعليقs
تم إقراره DPW (تم التحقق رسميا)
مغلق DPW (تم التحقق رسميا)
فتح jaw1351 (مستخدم مسجل)
Sweetwater Street has not been repaved in a very long time. I believe it was suppose to be repaved a few years ago when other roads in this area were being resurfaced but it was not.
jaw1351 (مستخدم مسجل)
paved? This section is a mess!!
I thought the entire street would be fixed.
مغلق DPW (تم التحقق رسميا)
فتح jaw1351 (مستخدم مسجل)
تم إقراره DPW (تم التحقق رسميا)
مغلق DPW (تم التحقق رسميا)