Tom
-
Water Leak from Cover, South Prospect St at Maple Street تم حفظه في الأرشيف215 S Prospect St Burlington, Vermont - Burlington ElectricWater is leaking from a small metal cover in the southbound lane of South Prospect Street just before its intersection with Maple Street. (It is by the stop sign.) This has been the case most of the summer. It is enough water to flow northbound down South Prospect Street a few hundred feet, and once it freezes, will be ice in the roadway.
-
Street Sweeping تم حفظه في الأرشيف475 Chapel St New Haven, Connecticut - Wooster SquareLots of glass on the road and shoulders on Chapel Street underneath the I-91 overpasses. Thank you for sweeping both sides.
-
Street Lamp تم حفظه في الأرشيف189 Elm St New Haven, CT 06511, USA - DowntownLight malfunction. Northwest corner of Elm and College streets. LED street light stones at approximate rate of 12 blinks per 10 seconds. There are nine past SCF requests going back 2+ years. Thank you.
-
Traffic Signal / Pedestrian Signal تم حفظه في الأرشيفOrange St At Mitchell Drive New Haven, Connecticut - East RockThe traffic signal at Orange Street and Mitchell Drive/Cold Spring Street (by Wilbur Cross High School) has a timing issue. The green for north/south vehicles on Orange Street is 40 seconds long. The green for east/west vehicles is only 10 seconds long despite having more traffic. What explains the 4:1 ratio? Thank you for the help TT&P!
-
Traffic Signal تم حفظه في الأرشيف361 Rt 7 South Rutland, Vermont - Rutland CountyUS 7 northbound traffic signal at Seward Road (in Rutland Town, adjacent to Denny's). The far right signal head appears to illuminate green and red lights simultaneously. (Sunday, 8/22, 11 am)
-
Street Sweeping تم حفظه في الأرشيف45-77 Humphrey Street New Haven, Connecticut - Mill RiverThe road and bike lane of Humphrey Street has glass for the entire westbound stretch between James Street and State Street.
-
Traffic Signal / Pedestrian Signal تم حفظه في الأرشيفGrove St At College St New Haven, Connecticut - DowntownAt 2:30 pm Monday (12/21/15), the signal at Grove and College/Prospect went through three full cycles of vehicle traffic in each direction after the pedestrian button was pushed before switching to the pedestrian crossing phase. It wasn't clear why - the button had been pushed on multiple corners (I was on the SW), and vehicle traffic was light.