Description
They need to stop patching the potholes on Columbia ave and pave the entire ave. Especially at the end of the bridge were it's the worst part.
They need to stop patching the potholes on Columbia ave and pave the entire ave. Especially at the end of the bridge were it's the worst part.
4 Comments
City of Hammond (Verified Official)
Public Works 2 (Registered User)
Acknowledged Engineering Department (Verified Official)
We are working on repaving Columbia from the express way to 169th roughly. I do not have a date currently but this is on our radar.
Thank you.
Engineering Department (Verified Official)