Beschreibung
The right lane in both directions of Energy Park Drive from Lexington to Highway 280 needs to be re-plowed, sanded, and salted - especially the twisty part between Raymond and Snelling. Thanks.
The right lane in both directions of Energy Park Drive from Lexington to Highway 280 needs to be re-plowed, sanded, and salted - especially the twisty part between Raymond and Snelling. Thanks.
2 Kommentierens
Anerkannt Public Works Admin 1 (Registrierter Benutzer)
Geschlossen DSI Admin 3 (Registrierter Benutzer)