Summer is almost gone and nothing has been done to S. Arlington from Central Entrance to Lake Superior College. This winter the snow plows will again tear up sections and cause huge potholes. The least that should be done is an overlay on the entire south section. This road get a huge amount of traffic, much of it heavy equipment - logging trucks, semi's etc.
4 Comments
Bob (Registered User)
Bob (Registered User)
Bob (Registered User)
This happens often when roads are resurfaced here. Some contractors are very good at filing in around the sewer cover to get them level with the roadway and some are not.
Another thing noticeable about the Arlington project is that the lanes are not joined together very well in the center. A gap has been left for water to run into which will freeze and cause the new road to begin breaking.
Closed Bob (Registered User)
This happens often when roads are resurfaced here. Some contractors are very good at filing in around the sewer cover to get them level with the roadway and some are not.
Another thing noticeable about the Arlington project is that the lanes are not joined together very well in the center. A gap has been left for water to run into which will freeze and cause the new road to begin breaking.