Description
The brand new pavement on Chestnut St. is several inches above the storm drains. This forces people to either weave into the next lane or bear the brunt of the drop. This is unacceptable for new pavement and will decrease the life of the road.
1 Comment
關閉 ChrisMD123 (Registered User)