الوصف
There are three areas on Hemlock Road where the pavement is failing and pot holes are forming, In front of 2 and 5. As well as between 9 and 11. The pictures TRY to show the issues.
There are three areas on Hemlock Road where the pavement is failing and pot holes are forming, In front of 2 and 5. As well as between 9 and 11. The pictures TRY to show the issues.
5 تعليقs
jpc3200 (مستخدم مسجل)
jpc3200 (مستخدم مسجل)
Public Works - BD (Streets & Sewers) (مستخدم مسجل)
تم إقراره Public Works - DA (Inspections) (تم التحقق رسميا)
مغلق Public Works - DA (Inspections) (تم التحقق رسميا)