Descripción

The sidewalk along Harding Place to Linbar Drive was completed several weeks ago, except for the last 20 feet or so at Linbar Drive. I realize that concrete can't be poured in subfreezing weather, but as soon as we have several consecutive days of milder weather, this sidewalk needs to be completed.