Descrição
The makeshift driveway at the Burlington College site has broken the sidewalk and bike lane.
também perguntou...
P. Problem with sidewalks:
R. Missing segment
R. Missing segment
The makeshift driveway at the Burlington College site has broken the sidewalk and bike lane.
32 Comentários
Reconhecido SCormier (Oficial Verificado)
Fechado SCormier (Oficial Verificado)
IT Department (Oficial Verificado)
Reopened RJ Lalumiere (Utilizador Registado)
RJ Lalumiere (Utilizador Registado)
Fechado SCormier (Oficial Verificado)
Reopened Brian Perkins (Utilizador Registado)
Fechado burlingtonresident2012 (Utilizador Registado)
burlingtonresident2012 (Utilizador Registado)
Brian Perkins (Utilizador Registado)
Reopened Brian Perkins (Utilizador Registado)
Fechado burlingtonresident2012 (Utilizador Registado)
burlingtonresident2012 (Utilizador Registado)
Reopened Bnice (Utilizador Registado)
burlingtonresident2012 (Utilizador Registado)
Fechado burlingtonresident2012 (Utilizador Registado)
Display Name Blocked (409268) (Utilizador Registado)
In your expert opinion you have decided that this is perfectly fine bike lane width. Do you have the authority to dictate was is an appropriate bike lane width? You are degrading someone's legitimate concern. The issue has been answered, but the underlying safety issue is still unresolved.
Reopened Toiletmanners (Utilizador Registado)
RJ Lalumiere (Utilizador Registado)
To be clear, not only is the bike lane obstructed, but even worse the sidewalk is non-existent presently. I hope restoration comes with the expiry of the permit, otherwise the city can follow up with the contractor ASAP.
DPW, thank you for the Excavation Inspector's contact information.
burlingtonresident2012, I think the relatively large number of votes for this issue shows that many Burlingtonians care about this issue. Please do not try to dismiss our experiences. Once the contractor actually rectifies the temporary situation everyone will be glad to have the issue closed. Thanks for understanding.
Fechado SCormier (Oficial Verificado)
Reopened Brian Perkins (Utilizador Registado)
Burlingtonian (Utilizador Registado)
That Guy (Utilizador Registado)
RJ Lalumiere (Utilizador Registado)
Yea, today it looked like they were trenching for the new ingress curbing, but tonight still nothing constructed. It is concerning that this is dragging on so long (weeks now, well before I reported it) since soon we won't be able to pour the concrete and lay the asphalt. It would NOT BE OK for it to be in this condition all winter.
Please work with the contractor to expedite this work and have it completed ASAP.
BTVHobbes (Utilizador Registado)
Observation from this morning: Curbing is cast, grading and leveling for new driveway in progress, signage is much more complete in comparison to last week. Cones still blocking bike lane (but there is a traffic merge sign now) Contractor is 5 days past the end date of the permit.
Hope this is going to be done before the end of this week.
That Guy (Utilizador Registado)
Reconhecido Code 1 (Oficial Verificado)
Code 1 (Oficial Verificado)
Fechado Code 1 (Oficial Verificado)
Toiletmanners (Utilizador Registado)
BTVHobbes (Utilizador Registado)
Toiletmanners (Utilizador Registado)