الوصف
Remove and replace heaved sections of sidewalk due to tree roots. Prep, shim and overlay two 25' section of sidewalks in front of 38 Valley Rd.
سئل أيضا...
Q. Please indicate the type of sidewalk / curb issue being reported.
A. Cracked or Broken Curb/Sidewalk, Uneven Surface
A. Cracked or Broken Curb/Sidewalk, Uneven Surface
7 تعليقs
Needham DPW (تم التحقق رسميا)
Highway Assistant Superintendent (تم التحقق رسميا)
تم إقراره Highway Assistant Superintendent (تم التحقق رسميا)
Highway Assistant Superintendent (تم التحقق رسميا)
Highway Superintendent (تم التحقق رسميا)
The Town implemented a sidewalk inventory and condition survey during the fall of 2015. The
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
مغلق Highway Assistant Superintendent (تم التحقق رسميا)
Looking Around (مستخدم مسجل)