Mô tả
It's been a few weeks since Dunwoody Club Dr was repaved. On eastbound Dunw Club Dr, approaching Happy Hollow, there are a few manholes (sewers) where the pavement has been cut away around the manhole covers but the contractor never came back to put the concrete around the manhole. This leaves a gap between the pavement and the manhole cover and drivers are attempting to straddle the manhole to avoid the bump. Some drivers are steering into oncoming traffic to avoid this.
cũng đã hỏi...
Đáp. NO
Đáp. NO
Đáp. Paving not finished on Dunwoody CLub Dr
20 Bình luậns
Được thừa nhận Dunwoody Public Works (Chính thức đã xác nhận)
Public Works Inspector (Người dùng đã đăng ký)
Dunwoody Public Works (Chính thức đã xác nhận)
Đã đóng Dunwoody Public Works (Chính thức đã xác nhận)
Reopened Waterford Resident (Người dùng đã đăng ký)
Được thừa nhận Dunwoody Public Works (Chính thức đã xác nhận)
Monte Lester (Construction Management--City of Dunwoody) (Người dùng đã đăng ký)
Đã đóng Dunwoody Public Works (Chính thức đã xác nhận)
Reopened Waterford Resident (Người dùng đã đăng ký)
Được thừa nhận Dunwoody Public Works (Chính thức đã xác nhận)
Đã đóng Dunwoody Public Works (Chính thức đã xác nhận)
Reopened Waterford Resident (Người dùng đã đăng ký)
Được thừa nhận Dunwoody Public Works (Chính thức đã xác nhận)
Monte Lester (Construction Management--City of Dunwoody) (Người dùng đã đăng ký)
Waterford Resident (Người dùng đã đăng ký)
Đã đóng Dunwoody Public Works (Chính thức đã xác nhận)
Reopened Waterford Resident (Người dùng đã đăng ký)
Được thừa nhận Dunwoody Public Works (Chính thức đã xác nhận)
Waterford Resident (Người dùng đã đăng ký)
Public Works Inspector (Người dùng đã đăng ký)
This issue has been marked as a duplicate of issue 2995182.
Issue 2995182 has already been closed and archived.
Please follow the link to view details on the resolution
of issue 2995182.