This is an unaffiliated request

New Road not finished properly Inilagay sa Artsibo

Division Street Derby, Connecticut Ipakita sa Mapa Itago ang Mapa
Move the marker to represent your issue's location. The address will not change.

Taong nagreport

ID ng Isyu:

2728692

Submitted To:

Komunidad

Kategorya:

Wala

Tiningnan:

2445 beses

Lugar:

Ansonia

Inireport:

noong

Deskripsyon

The new road that was just completed on Division Street, past the Griffin Hospital, has not been finished properly. The street is lower than the man-hole covers, and it is now an obstacle course to drive down Division Street without damaging your car! This will be a huge problem for the Snow Shovels come winter time. The Man-hole covers are approximately 3 inches above the level of the street, causing huge problems for cars to drive down the road. This was brand-new construction that was completed recently, and it was done with the lowest level of quality assurance. I view this terrible job as a road hazard for the people of the area.


4 Komentos

  • Display Name Blocked (344547) (Rehistradong User)

  • Lorifr1 (Rehistradong User)

  • Isinara Planner (Rehistradong User)

  • Lorifr1 (Rehistradong User)

Sarado ang komento para sa mga isyu na nasa artsibo.