The Department of Public Works has received this issue and will forward it to our Highway Division for investigation. Thank you for bringing this issue to our attention.
The Town implemented a sidewalk inventory and condition survey during the fall of 2015. The
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding. Spot repairs are made to reduce tripping hazards
The Town implemented a sidewalk inventory and condition survey during the fall of 2015. The
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
7 تعليقs
Needham DPW (تم التحقق رسميا)
Highway Assistant Superintendent (تم التحقق رسميا)
تم إقراره Highway Assistant Superintendent (تم التحقق رسميا)
Highway Assistant Superintendent (تم التحقق رسميا)
Highway Superintendent (تم التحقق رسميا)
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding. Spot repairs are made to reduce tripping hazards
مغلق Highway Superintendent (تم التحقق رسميا)
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
Looking Around (مستخدم مسجل)