The Department of Public Works has received this issue and will forward it to our Highway Division for investigation. Thank you for bringing this issue to our attention.
The Town implemented a sidewalk inventory and condition survey during the fall of 2015. The
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding. Spot repairs are made to reduce tripping hazards
The Town implemented a sidewalk inventory and condition survey during the fall of 2015. The
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
7 Comments
Needham DPW (Verified Official)
Highway Assistant Superintendent (Verified Official)
Acknowledged Highway Assistant Superintendent (Verified Official)
Highway Assistant Superintendent (Verified Official)
Highway Superintendent (Verified Official)
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding. Spot repairs are made to reduce tripping hazards
Closed Highway Superintendent (Verified Official)
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
Looking Around (Registered User)