Hãy mời hàng xóm và bạn bè của quý vị sử dụng SeeClickFix để họ có thể đăng bài, bình chọn và bình luận về các vấn đề trong thành phố và khu vực xung quanh của quý vị.
The Department of Public Works has received this issue and will forward it to our Highway Division for investigation. Thank you for bringing this issue to our attention.
The Town implemented a Town wide sidewalk inventory and condition survey study in the fall of 2015. The sidewalk study should be completed by the consultant by November, 2016. The Town will review the data and draft a priority sidewalk reconstruction plan and submit a request for funding. Sink holes and tripping hazards will be patched by the DPW.
The Town implemented a sidewalk inventory and condition survey during the fall of 2015. The
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
7 Bình luậns
Needham DPW (Chính thức đã xác nhận)
Highway Assistant Superintendent (Chính thức đã xác nhận)
Được thừa nhận Highway Assistant Superintendent (Chính thức đã xác nhận)
Highway Assistant Superintendent (Chính thức đã xác nhận)
Highway Superintendent (Chính thức đã xác nhận)
Đã đóng Highway Superintendent (Chính thức đã xác nhận)
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
Looking Around (Người dùng đã đăng ký)