Description
I work at misty gardens. The city called last week and asked if a day worked for much needed road maintenance. As everyone knows there's only one road to Misty. After they told us to close early (2 and a half hours early) and spent a mere 30 minutes on the horrible road. Now it's worse than it was before. It needs to be fixed as soon as possible because we are getting grief from customers.
The picture attached is before but this is how severe it is. And all the crew did was throw sand on it and put up a sign. You now have to take the ditch yo avoid it.
7 Comments
PW - Admin. Asst. (Registered User)
Works & Utilities Manager (Registered User)
Acknowledged Engineering Coordinator (Registered User)
Kayla421 (Registered User)
Works & Utilities Director (Registered User)
On the May 9th, 2016 City Council Meeting, Council approved the full reconstruction of Bruce Street. The reconstruction will occur in July and/or August. The reconstruction will remove the low quality material and replace it with gravel material complete with geotextile materials to create a strong roadway. This roadway will now be a gravel surface and will have calcium chloride dust control material applied annually the same as used on other gravel roads throughout the City.
Until the time of reconstruction, City crews will maintain the roadway as passable. Thank you.
Engineering Coordinator (Registered User)
Closed Engineering Coordinator (Registered User)