Descrição
This mound of dirt has been sitting here waiting for the bridge to be built so that Rocky River School is with-in code of having two exits from the school. This, I believe, will become the main entrance to the school and hopfully be made attractive with a school banner accross the road leading up and over the bridge. There is the mound of dirt on the other side of the tracks for the other end of the bridge also. When will this be built?
11 Comentários
Neighbor of the school (Visitante)
Nieghbor (Visitante)
Chris Harris (Visitante)
Chris (Visitante)
Display Name Blocked (96083) (Utilizador Registado)
Display Name Blocked (96083) (Utilizador Registado)
Display Name Blocked (96083) (Utilizador Registado)
Display Name Blocked (96083) (Utilizador Registado)
Display Name Blocked (96083) (Utilizador Registado)
Display Name Blocked (96083) (Utilizador Registado)
Encerradas Display Name Blocked (96083) (Utilizador Registado)