Descrizione
Please repair sidewalk in front of 33 Elmwood Rd. Eric Kaplan notified DPW.
ha chiesto inoltre...
D. Please indicate the type of sidewalk / curb issue being reported.
R. Cracked or Broken Curb/Sidewalk, Uneven Surface
R. Cracked or Broken Curb/Sidewalk, Uneven Surface
5 Commentos
Needham DPW (Ufficialità verificata)
Riconosciuto Highway Assistant Superintendent (Ufficialità verificata)
Highway Superintendent (Ufficialità verificata)
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding. spot patching done to reduce tripping hazards
Chiusa Highway Superintendent (Ufficialità verificata)
The Town implemented a sidewalk inventory and condition survey during the fall of 2015. The
sidewalk study should be completed by December, 2016 at which time the Town will review a draft priority list and seek funding.
Looking Around (Utente registrato)