Thank you for checking. As you can see the side walk narrows with the tree and gravel making it difficult for wheel chairs, strollers people with canes and able pedestrians to pass. When they step off the curb into the gravel they sink or trip. The sidewalk in front of 333 Longwood Ave was repaired and metal grates placed around the trees. Are there plans to finish this section? Ideally, removing the trees to widen the side walk would be safer for patients, families trying to get to clinics at 333 and 319 Longwood Ave.
4 تعليقs
تم إقراره Boston Open311 (تم التحقق رسميا)
Boston Open311 (تم التحقق رسميا)
مغلق Boston Open311 (تم التحقق رسميا)
DCDB (مستخدم مسجل)