Update: Thank you for removing the pile of rocks in the street but the large piping in the drainage area is still there in front of the fire hydrant blocking access in case of a fire.
A few weeks ago there was sewer line work done on the easement between two properties. I believe the work has been completed but construction derbies remains and work is incomplete. LARGE piping and a large pile of land fill (pea gravel?) has been left behind in the street and along water drainage areas directly in front of a fire hydrant. Additionally the lid that is placed under the actual manhole was not set in place and remains with the unsightly debris.