We are under contract to pave this street. It is first on the list. The contractor will first mill off about 1.5 inches of the existing asphalt from gutter to gutter, the whole length of the street, then put down a new lift of asphalt to match the gutter. As soon as I have the actual date, I'll pass the information on to the folks on High Vista. Thanks for your patience.
We are mobilizing today, July 17, 2015 and will begin the repairs on Monday. We start with milling off about 1.5 inches of existing asphalt and will place a new lift of asphalt to match the existing gutters.
Please spread the word that we will need for cars to park off of the street. The Contractor will post signs.
3 تعليقs
Newnan, Georgia (مستخدم مسجل)
مغلق City Engineer (مستخدم مسجل)
City Engineer (مستخدم مسجل)
We are mobilizing today, July 17, 2015 and will begin the repairs on Monday. We start with milling off about 1.5 inches of existing asphalt and will place a new lift of asphalt to match the existing gutters.
Please spread the word that we will need for cars to park off of the street. The Contractor will post signs.