Descrição
When the on ramp was repaired they did not line it up with the existing pavement. There now is a 2-3 inch bump as you enter the on ramp. We should get the 195 operator to fix this.
When the on ramp was repaired they did not line it up with the existing pavement. There now is a 2-3 inch bump as you enter the on ramp. We should get the 195 operator to fix this.
2 Comentários
Reconhecido City of Richmond (Utilizador Registado)
Fechado City of Richmond (Utilizador Registado)