Description
Soil stabilization measures have not been installed by Developer. A graded construction site should have straw, seed, silt fencing, or other temporary stabilization measures so that soil/debris doesn't make a mess of streets and clog stormwater drains.
a aussi demandé...
Q. What type of issue is this?
A. Erosion Issue
A. Erosion Issue
Q. Please select the type of drainage issue, if erosion use N/A.
A. Erosion issue, N/A
A. Erosion issue, N/A
2 Commentaires
City of Huntsville (Huntsville Connect) (Membre officiel vérifié)
Reconnu Huntsville Engineering (Membre officiel vérifié)
Thank you for contacting the City of Huntsville with your service request. Your inquiry is being processed, and our department will respond as soon as possible.
Thank you,
The Huntsville Connect Customer Service Team