This is an unaffiliated request

Waiting for the Roads to be Paved... تم حفظه في الأرشيف

Poplar Street Norwalk, Connecticut عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

(ضيف)

ID قضية:

1313046

Submitted To:

الجماعة

فئة:

لا يوجد

شاهدوا:

785 مرات

حي:

Norwalk

ذكرت:

في

الوصف

This "project" of tilling the roads and then paving them is taking way too long. It is already weeks behind schedule, and leaves dangerous potholes and manholes exposed. The machine that took the edge of the road to be paved off in front of my driveway, left such a harsh ledge I am unable to get my car out without severely damaging the front bumper. The rough terrain was left over the weekend, and now it is the end of the day on Tuesday and nothing has been done. Not only is this an eyesore, but it is also a nuisance. It is creating difficulties with driving and even walking the dog on uneven pavement. When will this "project" be finished? ...hopefully before the first snow...


قضايا القريبة

1 تعليق

التعليقات مغلقة لقضايا المؤرشفة.